2009 Results
Structural Efficiency
Place | Bridge Weight (lbs.) |
Failure Load (lbs.) |
Load/Weight Ratio |
|
---|---|---|---|---|
Muller Engineering “Just Water Under the Bridge” |
1st | 18.1 | 442.5 |
24.5 |
PEH Architects “The Ginger-headed Step-bridge” |
2nd | 4.1 |
82.5 |
20.1 |
Ascent Group “Eccentrically Loaded” |
3rd | 13.1 | 214.5 |
16.4 |
Heery “Team GingerBridge” |
4th | 5.6 |
62.5 |
11.2 |
The Leffler Group “Graham-Lam” |
5th | 14.8 | 157.5 |
10.7 |
GEI Consultants “Terzaghi-Gedächtnis-Pfefferkuchenbrücke” |
6th | 5.1 | 47.0 | 9.2 |
CU Denver “Chichen Itza” |
7th | 34.3 | 223.5 | 6.5 |
Structural Consultants Inc. “Ski Train” |
8th | 9.0 | 56.0 | 6.2 |
John Elliott & Kevin Krcek “We need to run some ductwork through your beam” |
9th | 9.5 | 45.0 | 4.7 |
Terracon “Bridge of Broken Dreams” |
10th | 5.6 | 0.0 | 0.0 |
2009 Architectural Design
Place | Architectural Design Score (out of 10) |
|
---|---|---|
Muller Engineering “Just Water Under the Bridge” |
1st | 8.6 |
Structural Consultants Inc. “Ski Train” |
2nd | 7.8 |
Ascent Group “Eccentrically Loaded” |
3rd | 7.2 |
Heery “Team GingerBridge” |
4th | 6.5 |
Terracon “Bridge of Broken Dreams” |
5th | 5.8 |
John Elliott & Kevin Krcek “We need to run some ductwork through your beam” |
6th | 5.71 |
CU Denver “Chichen Itza” |
7th | 5.69 |
PEH Architects “The Ginger-headed Step-bridge” |
8th | 5.4 |
GEI Consultants “Terzaghi-Gedächtnis-Pfefferkuchenbrücke” |
9th | 3.9 |
The Leffler Group “Graham-Lam” |
10th | 3.8 |